What to Update First in a Kitchen: 6 Smart, Affordable Steps

What to update first in a kitchen shown in a Utah home with freshly painted sage cabinets, new brass pulls, and under-cabinet lighting over the original counters

Updating a kitchen sounds simple until you start pricing it. Counters, cabinets, lighting, appliances, and flooring all compete for the same budget, and every contractor you call has a reason their piece should come first. Deciding what to update first in a kitchen comes down to two things: which changes you will notice every day, and which ones hold their value.

1. The Smaller Job Pays Back More

Each year, Zonda’s Cost vs. Value report prices common remodeling projects city by city and compares each one to the value it adds at resale. In Salt Lake City, a minor midrange kitchen remodel averaged $27,871 in 2025 and recouped 109.8% of its cost. A major midrange remodel averaged $79,909 and recouped 50.8%. An upscale major remodel averaged $161,009 and recouped 38.7%.

The kitchen that costs nearly three times as much gets back about half of what went into it. For most homeowners, the smaller project is the better use of money, whether you stay or sell.

2. Start With the Cabinets

Cabinets cover more of the room than anything else you can change, so they set the look of the whole kitchen. Zonda’s minor remodel is built around that idea: the cabinet boxes stay, and the doors and drawer fronts are replaced along with the hardware.

Painting reaches the same goal by keeping the doors you already have. Solid boxes and doors get sanded, primed twice, and finished in a satin color of your choice, at a fraction of the cost of replacement. If the boxes are water-damaged or falling apart, replacement is the honestly the best answer.

Existing kitchen cabinet doors painted warm white satin on their original cabinet boxes above tan granite counters

3. Change the Hardware Next

Hardware is the part of the kitchen your hands touch dozens of times a day, and it costs little compared with everything else on this list. Longer pulls or a new finish change the room more than their price suggests. If the new pieces match your existing hole pattern, they can go on the same day the painted doors are rehung. Our post on kitchen cabinet hardware trends covers sizing and finish choices.

4. Fix the Lighting

A dim kitchen makes new cabinets and old counters look the same. Under-cabinet lights and a brighter fixture over the island show off the work you just paid for, and they change how a paint color reads after dark. Test a cabinet color under your own lights before you commit to it.

5. Keep the Counters Unless They Are Failing

Countertops are expensive and hard to change halfway. If yours are cracked, stained, or laminate that has started to peel, replace them. If they are solid granite or quartz that you do not love, choose a cabinet color that works with them. Our guide to cabinet paint colors that go with granite walks through the pairings.

Order matters if you do both. Install new counters, backsplash, and flooring first, and paint the cabinets last so nothing new gets scuffed or taped over. The one exception is a hardwood floor being stained, where the cabinets come first.

Under-cabinet lighting washing across counters below painted kitchen cabinets in the evening

6. Move Walls Only for a Real Problem

Moving plumbing, walls, or the range is what turns a minor remodel into a major one, and the Zonda figures show how much of that money stays in the house. Change the layout when it does not work for how you cook. A kitchen that works but looks tired is only just a finish problem.

What to Update First in a Kitchen: The Order

Cabinets, then hardware, then lighting, with counters only if they are failing and the layout only if it fails you. Homeowners rated a kitchen upgrade 10 out of 10 for satisfaction in the National Association of Realtors 2025 Remodeling Impact Report, and the projects in this order deliver most of that change.

Allen Brothers Cabinet Painting handles the first two steps. Doors are finished off-site in our shop, the in-home work takes about three and a half days, and the bid is a fixed price based on your door and drawer count. See how our kitchen cabinet painting and refinishing process works, then request a bid when you are ready.

Frequently Asked Questions

What adds the most value when updating a kitchen?

In Zonda’s 2025 Cost vs. Value report, a minor midrange kitchen remodel in Salt Lake City recouped 109.8% of its cost at resale, while a major midrange remodel recouped 50.8%. Smaller, surface-level updates return more of what you spend.

Should I replace countertops or cabinets first?

Start with the cabinets if the counters are in good shape, since cabinets cover more of the room. If you replace both, install the counters first and paint the cabinets last.

Is painting cabinets cheaper than replacing them?

Yes. Painting keeps your existing boxes and doors and changes the finish, at a fraction of the cost of new cabinets.

How long does cabinet painting take?

About a week in total. Doors are picked up the Tuesday before, and in-home work runs about three and a half days, Monday morning through Thursday afternoon.